Navigate to...

Overview
Complete
Preventive Maintenance Checklist
30 Nov 2020 / SafetyCulture Staff
Inspection score
75%
Failed items
4
Created actions
0
Conducted on

30th Nov, 2020

10:48 AM PST

Prepared by
SafetyCulture Staff
Location
Select Week
Unanswered
Failed items
4
Non-critical items / Piping
Check CDA piping
Not Yet Done
Non-critical items / Nozzle
Change if nozzle broken
Not Yet Done
Non-critical items / Filter or strainer
Check exhaust scrubber ducting
Not Yet Done
Non-critical items / Oscillators
If the oscillator malfunction, change i
Not Yet Done
Critical Items
100%
Motor
100%
Check all motors
Done - No Issues Found
Pump
100%
Check the condition of all Hollmuller pumps
Done - No Issues Found
Check the condition of all Assomma pumps
Done - No Issues Found
Check all chemical pumps
Done - No Issues Found
Conveyor gear
100%
Check the condition of the roller and chain
Done - No Issues Found
Non-critical items
4
63.64%
Piping
1
50%
Check all piping for any leakage
Done - No Issues Found
Check CDA piping
Not Yet Done
Nozzle
1
50%
Change if nozzle broken
Not Yet Done
Properly fixed after change
Done - No Issues Found
Filter or strainer
1
75%
Check condition for all filters and strainer
Done - No Issues Found
No leaking after fixed
Done - No Issues Found
Check exhaust scrubber ducting
Not Yet Done
Check rinsing filter, change if any corrosion
Done - No Issues Found
Main panel box
100%
Check the parameter shown in panel box
Done - No Issues Found
Check aqua control
Done - No Issues Found
Oscillators
1
0%
If the oscillator malfunction, change i
Not Yet Done
Completion
Prepared by (Maintenance Personnel) Name and Signature
SafetyCulture Staff
30th Nov, 2020 10:51 AM PST
Verified By (Engineer/Supervisor) Name and Signature
SafetyCulture Staff
30th Nov, 2020 10:51 AM PST